From 20-unit workforce housing to 200-unit luxury apartments, our modular building system delivers move-in ready homes in half the time of conventional construction, with superior quality control and predictable budgets.
Whether you're developing market-rate apartments, student housing, or affordable workforce housing, our modular system adapts to your project requirements.
Market-rate and luxury apartment buildings from 3 to 12 stories. Configurable unit layouts: studios, 1-BR, 2-BR, and 3-BR options with full kitchen and bath installed at the factory.
Dormitory and student apartment complexes with shared common areas. Fast deployment for semester deadlines, 200 beds in 7 months from groundbreaking to handover.
Affordable, durable housing for energy, mining, and remote work camps. Built to withstand extreme climates with minimal maintenance requirements over 30+ year lifespan.
Every MODURA apartment module arrives on-site with electrical, plumbing, HVAC, insulation, drywall, flooring, kitchen cabinetry, bathroom fixtures, and interior doors fully installed and inspected at the factory. Site work is limited to module connections, exterior cladding, and common area finishes.
Standard specifications for our modular apartment system. Custom configurations available upon request.
| Parameter | Specification | Notes |
|---|---|---|
| Building Height | 3–12 stories | Steel-frame modules, concrete podium for 5+ stories |
| Module Size | 3.6m × 12m × 3.0m | Standard module, custom sizes available |
| Unit Types | Studio, 1-BR, 2-BR, 3-BR | Combinable modules for larger units |
| Typical Project Size | 20–200 units | Multi-building complexes supported |
| Construction Timeline | 6–10 months | Groundbreaking to handover, including site work |
| Acoustic Rating | STC 55 / IIC 52 | Exceeds International Building Code requirements |
| Fire Rating | 1–2 hour | Type IA, IB, or IIA construction |
| Energy Efficiency | 25% above IECC | Optional net-zero ready packages |
| Warranty | 10-year structural | 2-year finish, 1-year systems |
Multi-family developers ask two questions in the first call: what is my all-in cost per unit, and when does the first tenant pay rent? Below is how a 120-unit mid-rise project actually prices out, and where the factory changes the arithmetic.
| Cost Line | Modular (120 units) | Conventional (120 units) | Why It Diverges |
|---|---|---|---|
| Unit module fabrication | $96,000–$134,000 / unit | n/a | Factory labour at $28–42/hr vs $65–95/hr site labour |
| Structure & building shell | $61,000–$84,000 / unit | $72,000–$103,000 / unit | No scaffolding, no repeated formwork, no weather protection sequence |
| MEP rough-in & fit-out | $34,000–$47,000 / unit | $42,000–$58,000 / unit | Bench assembly; approximately 22% less rework than site trades |
| Foundations & site works | $18,000–$29,000 / unit | $27,000–$41,000 / unit | Perimeter slab and pile caps only, no full-footprint slab |
| Common areas & envelope | $21,000–$31,000 / unit | $21,000–$31,000 / unit | Parity. Scope is set by the amenity programme either way |
| Construction financing period | 9–13 months | 19–26 months | Interest is charged monthly on the drawn balance |
The financing line is where the factory quietly wins. On a $28M construction loan at 8.5%, every month of programme removed avoids roughly $198,000 of interest carry. On the revenue side, 120 units stabilising at $1,850 average monthly rent produce about $2.66M of gross annual rent . So each month the certificate of occupancy moves forward is worth roughly $222,000 at the top line, before any valuation uplift on stabilised NOI. A 10-month programme compression is therefore worth more than the entire structural cost premium in most markets.
Carry is not just interest. It is interest, plus site security, plus construction insurance, plus the opportunity cost of equity sitting in a non-income-producing asset. On the 120-unit example above, fully loaded carry runs at approximately $310,000–$365,000 per month . Which is why a modular programme that removes 10 months of site duration does not merely save interest, it removes an entire category of monthly exposure. Our total cost planning guide breaks down all eight carry line items, and the modular apartment cost guide covers the benchmarks this table is built from.
Modular is cheapest when modules repeat. A 120-unit building designed with four identical stacked floor plates and a single bathroom stack costs materially less per unit than the same 120 units drawn with fourteen bespoke layouts, because the factory amortises jig setup, tooling, and inspection sheets across the run. The practical rule we give developers: push variety into finishes and facade, not into structure and wet-wall positions. Repeating the wet-wall stack alone typically removes 6–9% from the modular fabrication line while changing nothing a tenant can see.
Apartment modules in the MODURA network run on two structural platforms, chosen by storey count and seismic category rather than by price alone:
Both platforms come out of production lines holding ISO 9001, ISO 14001 and ISO 45001 certification, with documented inspection gates at every workstation and records traceable to the module serial number. That traceability is what allows a modular apartment building to clear a lender’s third-party inspector without re-opening closed walls, the single most common cause of draw-schedule delay on conventional multi-family.
Party-wall acoustic separation is the number one tenant complaint in mid-rise rental. Our apartment modules deliver STC 55 / IIC 52 as standard, against the STC 50 / IIC 45 that most US building codes require for residential separation. The reason is structural rather than acoustic: in a factory, the flanking path between two modules can be sealed and verified before the units are closed out. On site, a subcontractor who leaves a 3mm gap behind a party wall has created a complaint the operator will live with for the whole hold period. Our acoustic performance guide covers the assembly detail and test protocol.
Ask for the documentation pack before you commit to a design, acoustic test reports, fire test certificates, steel mill certificates, and the factory inspection record template for your jurisdiction. Request the apartment documentation set and we will send it with your proposal.
| Milestone | Modular | Conventional |
|---|---|---|
| Design, engineering & permits | Month 0–4 | Month 0–6 |
| Foundations, site & utilities | Month 3–7 (parallel to factory) | Month 5–11 |
| Module fabrication | Month 4–11 (60–75% complete on dispatch) | n/a |
| Erection & module connections | Month 11–13 | Month 11–20 |
| Common areas, commissioning, CO | Month 13–16 | Month 20–28 |
| First rent roll | Month 16–18 | Month 27–31 |
The overlap between site works and factory production is the whole mechanism. Module production runs independently of weather and of site readiness. A delayed foundation does not stop the line, it only delays erection, and completed modules queue in the yard rather than accumulating standing time in the open. That is why the schedule variance on a modular apartment programme is measured in weeks, not quarters.
Real designs from MODURA’s LGS design library, proven layouts engineered to destination codes, customizable in layout, facade, and finishes.

Two-storey villa with mixed render and timber facade, floor-to-ceiling glazing, and stepped hillside terraces.
View Design →
Single-storey family design with wide covered outdoor living and seamless indoor-outdoor flow.
View Design →
Cube-format two-storey home with dark cladding and stone accents, garage included.
View Design →
Pool villa with render and stone facade over light-gauge steel frame, resort-grade finishes.
View Design →
US-standard single-family design: gable roof, covered porch, standard US appliance and fixture sizes.
View Design →
Compact mono-pitch design for starter homes, resort cabins, and infill lots.
View Design →Get a detailed proposal with timeline, budget, and unit configurations tailored to your site and market.