Standard Design Library

Harmony House

Single-storey family design with a wide covered outdoor room and seamless indoor-outdoor flow.

Ask About Harmony House

Harmony House pairs a simple single-level plan with generous covered outdoor living - the format senior-living operators and family buyers ask for most. Step-free entries come naturally to the format, and the plan adapts to your lot orientation and market.

Gallery

Photos & Details

Harmony House - Covered terrace living

Covered terrace living

Harmony House - Open living and dining

Open living and dining

Harmony House - Sea-view bedroom

Sea-view bedroom

Specification

What Ships With Harmony House

ItemDetail
StructureLGS frame, ICC-ES ESR-5348 evaluated system (IBC/IRC 2021 + CA/LA)
LevelsSingle storey
Facade optionsRender, timber, stone, dark cladding combinations, factory-applied
DeliveryFlat-pack kit (1-2 x 40ft containers) or volumetric modules
Fit-outShell / standard / turnkey (kitchen, bath, joinery factory-installed)
Code basisIBC/IRC + ASCE 7 (US), AS/NZS 4600 (AU/NZ), Eurocodes (EU)
CustomizationLayout, facade, glazing, finishes configurable
Inclusions & Options

Every Kit Ships Complete

Standard inclusions on every Harmony package — fit-out level is selectable from structural shell to turnkey.

Engineered LGS Frames

Complete light-gauge steel frames with all connection hardware, roll-formed to ESR-5348 evaluated sections.

Envelope Materials

Exterior cladding, roofing, membranes, and trims — factory-finished in your selected facade mix.

Windows & Doors

Double-glazed windows and exterior doors, sized and pre-fitted to the frame openings.

Full Drawing Set

Construction drawings engineered to your destination code, ready for your local permit holder.

Fit-Out Options

Kitchens, bathrooms, joinery, and flooring can be factory-installed to turnkey level.

Compliance Documents

Mill certificates, warranty, and destination-market compliance package shipped with every kit.

Delivery & Support

From Factory Gate to Your Site

StageWhat MODURA Coordinates
ProductionFactory slot reservation, quality gates, factory acceptance photo report
ShippingContainerized ocean freight, export documentation, marine insurance
ArrivalPort handling and inland transport to site, sequenced to erection order
ErectionErection manual, connection details, and remote support from our engineering team
Also in the Library

Other Standard Designs

Belle House design

Belle House

Two-storey hillside villa with stepped terraces.

Bazzurro House design

Bazzurro House

Pool villa with stone and render facade.

Zurich House design

Zurich House

Cube-format two-storey home with garage.

EOLO House design

EOLO House

Compact mono-pitch design for starter homes and resort cabins.

Dalhart House design

Dalhart House

US-standard single-family design with gable roof and covered porch.

Back to the Full Library

Build Harmony House in Your Market

Pricing, plan options, and delivery timelines adapted to your destination code.

Request Harmony House Pricing