Selected Projects

Real Buildings. Real Results.

Reference projects delivered through MODURA’s manufacturing network . Modular programs our partners build to our engineering and quality specifications, from resort cabins and villas to townhouses and exported home kits.

A-frame modular resort hotel courtyard with timber cabin modules
Hospitality, Resort Programs

A-Frame Resort Hotel Program

A-Frame Modules Timber Cladding Courtyard Layout

Complete cabin modules, structure, envelope, interiors, and MEP all finished in the factory, are shipped flat or complete and erected on light foundations in days, not months. The programme logic behind that compression is set out in our modular hotel construction timeline, and the resort-specific formats in modular resort & extended-stay construction.

  • Complete cabin modules with interiors and MEP finished in factory
  • A-frame geometry engineered for snow, wind, and seismic loads by destination
  • Rapid site erection on light strip or pile foundations
  • Layouts, finishes, and glazing customizable per resort brand
Reference: Resort courtyard program delivered through MODURA’s manufacturing network
A-frame modular cabins on a forest resort site
Hospitality, Eco-Resort

Forest Resort Cabin Development

Forest Site A-Frame Light Foundations

Forest and eco-resort sites demand construction that respects the landscape. Modular cabins arrive as finished units, are craned onto elevated light foundations, and leave the site, and its trees, largely undisturbed compared to conventional site building.

  • Elevated light foundations protect root systems and terrain drainage, see modular building foundation systems
  • Minimal wet trades on site, near-zero site waste in sensitive areas
  • Factory glazing and envelope sealing for weathertightness in forest climates
  • Phased delivery: cabins arrive sequenced for single-crane installation
Reference: Forest resort program delivered through MODURA’s manufacturing network
Modern prefabricated modular villa with pool
Residential, Villas

Modular Villa Programs

Single-Family Villa Custom Facades Pool & Landscape Ready

Custom villas pair architectural expression with factory precision. Render, stone, and timber facades are applied to light-gauge steel frames in the factory; the module arrives weathertight with kitchens, bathrooms, and joinery installed. Site work is limited to foundations, connections, and landscaping.

  • Light-gauge steel frame engineered to destination codes (IBC/IRC, AS/NZS, EN)
  • Render, stone, and timber facade options applied in factory, costed line by line in the modular cost breakdown guide
  • Kitchens and bathrooms pre-fitted with cUPC and CE-listed fixtures
  • Flat-pack or volumetric shipping modes by destination logistics
Reference: Villa program delivered through MODURA’s manufacturing network
Contemporary modular townhouse development
Residential, Multi-Unit

Townhouse Development, Australia Delivery

Multi-Unit Australia Delivery LGS Frames

Multi-unit townhouse programs combine repeatable module types with street-by-street facade variation. This reference development was delivered to Australia, one of the network’s most active export markets . With light-gauge steel frames engineered to AS/NZS 4600 and finishes localized per builder specification.

  • Repeatable module types with per-lot facade variation
  • LGS frames engineered to AS/NZS 4600 for Australian wind regions
  • Containerized shipping with sequenced delivery per construction stage, see cross-border modular logistics
  • Compliance documentation packages for local certifier sign-off
Reference: Australian townhouse program delivered through MODURA’s manufacturing network
Single-family prefabricated home from the export program
Residential, Export

Single-Family Export Program

US-Standard Designs Flat-Pack LGS Kits 60+ Countries

Single-family programs export complete light-steel home kits to 60+ countries, the ICC-ES evaluated framing system (ESR-5348) covers IBC/IRC compliance with California and Los Angeles supplements, and standard designs adapt to local tastes with factory-applied facades.

  • ICC-ES ESR-5348 evaluated light-steel framing system (IBC/IRC 2021 + CA/LA)
  • Flat-pack kits: one or two 40ft containers per home, erector-friendly manuals
  • Standard plan library with custom design services for developers
  • Mill certificates, warranty, and compliance documents shipped with every kit, the same paperwork chain described in modular quality comparison
Reference: Export home program delivered through MODURA’s manufacturing network
Aerial view of modular steel frame modules on a construction site
Logistics, Erection

Site Erection & Overseas Delivery

Containerized Shipping Crane Erection Export Packaging

Every export program ends on site. Modules ship containerized from East Asia with sequenced packing so the first-erected modules come off first; crane crews work from network erection manuals; and weekly shipment status reports keep developers and lenders informed from factory gate to final module.

  • Sequenced container loading matched to erection order
  • Erection manuals and connection details prepared per site crane plan, covered in depth in modular crane & equipment logistics
  • Weekly shipment status reports from factory gate to port to site
  • Destination-market compliance documentation with every shipment
Reference: Multi-site export logistics delivered through MODURA’s manufacturing network
Procurement, Due Diligence

How to Verify a Reference Project Before You Sign

Case-study pages are marketing. These are the seven artefacts that separate a verifiable delivery record from a rendered brochure, ask for every one of them, for a project in your own jurisdiction.

Artefact to request What it proves Red flag if withheld
Container & module packing list Module count, dimensions, and load sequence actually shipped Only renders, no shipment record
Bill of lading + port of discharge The goods physically left the factory and landed where claimed Blanked-out consignee and dates
Structural calculation package The building was designed to your destination code, not a generic one "Standard design" with no calc set
ICC-ES evaluation report Independent third-party evaluation of the framing system (ESR-5348) Self-declared compliance only
Mill certificates for structural steel Heat-number traceability of the steel grade actually used (Q355B) "Equivalent grade" unspecified
Factory Acceptance Test (FAT) report Electrical continuity, plumbing pressure, and airtightness measured pre-shipment Site inspection only, after the fact
Local certifier sign-off A building official in the destination market accepted the assembly "Approved in China" used as proxy
Cost & Programme

What These Programs Cost and How Long They Take

Realistic order-of-magnitude figures for an export modular program, based on the commercial structure used across our hospitality and residential reference builds. Every number below is a planning range, not a quotation. But the direction of each line is what matters when you compare against site-built alternatives.

Cost line Modular / prefabricated Conventional site-built Why it diverges
Structural shell Factory jig-set, tighter tolerance Site labour, weather-dependent Factory repeats absorb setup; site labour does not
MEP rough-in Pre-installed in module, tested before ship Trade sequencing on site Continuity tested in a controlled environment
Freight & logistics Material cost, containerised sea freight Near zero for local materials The one line where modular usually loses
Site preliminaries Weeks of crane + connection crew Months of scaffolding, supervision, welfare Prelims scale with programme duration
Financing carry Shorter draw period Longer draw, more interest Every month of programme removed removes a month of interest
Cost certainty at contract Fixed at factory gate, scope locked in factory drawings Open to site variations and weather delay claims The largest single difference in developer outcomes

The carry line is the one most often under-modelled. A modular program that reaches first revenue two months earlier than a conventionally built equivalent funds those months out of operating income rather than out of the development loan, and on a multi-unit project that swing typically outweighs the freight premium that modular pays on the logistics line. Work the full model in our modular construction ROI guide and total cost planning guide before you compare headline rates.

Programme

Milestones: Factory-Built vs Site-Built, Month by Month

Typical sequence for a mid-sized multi-unit export program (roughly 60–120 modules). Months are counted from contract signature to the point the client can actually use the building.

Milestone Modular (months) Site-built (months)
Design freeze & compliance drawings1–21–2
Foundation / enabling works1–2 (parallel with factory)1–2
Factory production of all modules3–5n/a
Superstructure / envelope0.5 (erection)4–6
MEP rough-in & fit-outincluded in factory3–5
Sea freight & port handling1–2 (overlapped)n/a
Connections, commissioning, certifier sign-off1–21–2
First revenue / occupancy6–1011–17

The compression comes from one structural fact: foundation and production run in parallel because the building is being made indoors while the ground is being prepared outdoors. That is why the gap widens on larger programs and narrows on very small ones. See the full sequence in our modular construction project timeline.

Before You Commit

Questions We Are Asked Before Every Export Contract

  • “Your reference projects are delivered by partner factories, who is actually accountable?” MODURA engineers the building and owns the specification; partner lines manufacture to it. The ICC-ES evaluation report, ISO certificates, and mill certificates name the holding entity for each scope, which is why we publish the holders rather than a single logo. The accountability chain is the point, verify it, don't assume it.
  • “Will my local building official accept a factory-built module?” The frame system carries ICC-ES evaluation (ESR-5348) covering IBC/IRC 2021 with California and Los Angeles supplements, and the fire assemblies are tested to ISO 3008-1 by Intertek. For markets outside North America we engineer to the destination standard, AS/NZS 4600 for Australia, EN for Europe, and ship the calculation package with the modules. Our guide to modular certification standards walks through what each market asks for.
  • “What happens if a module arrives damaged?” Modules ship with sequenced loading matched to erection order, so the first unit off the ship is the first unit up. Damage claims are handled against the packing list and bill of lading rather than estimates. Documentation discipline is why we insist on the artefact list above. See modular payment and draw schedules for how this ties into payment milestones.
  • “Can I phase delivery so I only pay for what I can install?” Yes, and on resort programs it is normal. Containerised shipping with sequenced delivery per construction stage lets a developer take the first phase to revenue while later phases are still in production. The trade-off is that phased programmes lose some of the factory-repetition saving, discussed in modular transportation logistics.
  • “How does this compare with just using shipping containers?” Container-based and purpose-built modular are different products. Containers are constrained to ISO dimensions and their structural capacity is a corner-post frame; our volumetric and hybrid modules are engineered to the destination building code with proper floor loading, thermal envelope, and fire separation. The comparison is set out honestly in modular vs container construction.

Request the full documentation pack, evaluation reports, certificate holders, structural calculation samples, and a prior shipment's packing list, against a specific project in your market. Request the documentation pack.

500+ Projects Delivered
60+ Countries Served
12,000+ Modules Manufactured
98% On-Time Delivery
Programme Detail

What Each Reference Programme Actually Built

Programme Scope Delivered System & Structure What It Proves
A-Frame Resort Hotel Program Repeat visitor units with pitched envelope, factory-fitted bathrooms and glazing, delivered to a hospitality operator Volumetric modules on a light gauge steel frame, ICC-ES ESR-5348 evaluated That a non-standard architectural form can still be built as repeated factory modules rather than bespoke site work
Forest Resort Cabin Development Amenity and accommodation pods for a remote, low-accessibility site Volumetric modules sized to the transport envelope, crane-set on prepared pads That a site with poor access rewards factory completion, because the number of site deliveries is minimised
Townhouse Development, Australia Multi-storey residential modules shipped cross-border and erected on site Hybrid volumetric plus structural elements engineered to AS/NZS 4600 That modular delivery works across regulatory regimes when the calculation package travels with the modules
Soledad, California Interim Housing Interim housing units delivered from the South China container module base Container modules, US market, IBC/IRC 2021 with California supplements That a US public-sector programme can be served from an Asian factory base with the right code evidence
Single-Family Export Program Individual family homes exported as complete modules Volumetric modules, turnkey internal fit-out That modular economics do not require twenty identical units; a single home can ship factory-complete

How the delivery is sequenced and who is accountable at each stage is explained in our modular construction timeline guide, and the commercial structure behind a multi-phase programme is covered in our modular ROI guide for developers.