Creating environments where older adults thrive — from independent living apartments to specialised memory care households. Our factory-built approach ensures every detail of accessibility, infection control, and acoustic comfort is precision-engineered before a single module reaches the site.
Senior living facilities must balance hospitality-grade comfort with clinical-grade safety — all while controlling costs in a sector where margins are tight and regulatory scrutiny is intense.
Phased developments adjacent to occupied buildings create unacceptable risk profiles. Construction noise, dust, and contractor movement compromise resident wellbeing and infection control protocols.
Every element — door widths, turning circles, threshold details, grab rail backing, tap forces — must meet BS 8300 and Part M. Site-built variations from specification create compliance risk that is expensive to rectify.
Senior living demands sophisticated mechanical and electrical systems: nurse call, wander management, access control, HEPA filtration, emergency power, and assistive technology — all of which create coordination challenges for traditional sequential trades.
Labour-intensive fit-out — wet rooms, wide corridors, enhanced acoustic separation, specialised MEP — drives per-square-metre costs well above standard residential. Fixed-price factory manufacturing eliminates on-site cost escalation.
Senior living environments are governed by healthcare building standards, accessibility regulations, and infection control protocols that demand precision execution.
| Standard | Requirement | MODURA Compliance |
|---|---|---|
| HBN 00-09 | Infection control in the built environment — surface finishes, ventilation strategy, water safety | Non-porous surfaces with welded joints; HTM 04-01 compliant water systems pre-installed and pressure-tested |
| BS 8300 | Design of accessible and inclusive environments — full accessibility for physical, sensory, and cognitive needs | All modules designed to BS 8300-2:2018; accessibility audit conducted at factory before delivery |
| Door Widths | Clear opening width ≥ 926mm for all habitable rooms; wheelchair turning circle 1,500mm in bedrooms and bathrooms | Standard module door sets factory-installed with verified clear widths; turning circles modelled in BIM |
| Wet Room Design | Level-access showering with slip resistance R11 minimum; Altro or equivalent safety flooring with coved skirting | Factory-formed wet room floor cassettes with integrated drainage falls; slip resistance tested to BS 7976-2 |
| Nurse Call & Wander Management | Nurse call points at bedhead, en-suite, and day spaces; wander management detection at exits with staff alert integration | Pre-cabled containment routes with pull-through draw wires; system agnostic — compatible with all major manufacturers |
| Acoustic Performance | DnT,w+Ctr ≥ 50dB between bedrooms; reverberation time ≤ 0.6s in communal spaces (HTM 08-01) | Independent module structure with acoustic break between units; factory-tested and certified |
| Fire Safety | 120-minute structural fire resistance; L1 fire detection and alarm system; sprinklers to BS 9251 | Full 120-minute compartmentation with intumescent perimeter seals at module joints; concealed sprinkler pipework |
| Air Quality | HEPA filtration to ISO 16890 ePM1 80%; minimum 10 l/s per person fresh air; positive pressure in clinical zones | Dedicated ventilation module per floor plate; filter change indicators accessible from corridor for maintenance without entering rooms |
| Emergency Power | Life safety systems on UPS with minimum 3-hour autonomy; generator connection for extended outages | Pre-wired essential circuits with automatic transfer switch; central battery system tested at factory |
Our manufacturing approach guarantees that every accessibility detail, every acoustic separation, and every infection control measure is executed to specification — not left to the variability of on-site workmanship. Modules arrive with wet rooms fully tiled and tested, MEP systems commissioned, and finishes inspected under factory quality control.
Our modular system scales across the full continuum of care, from active adult communities to high-acuity nursing environments.
Self-contained 1 and 2-bedroom apartments for active seniors. Open-plan layouts with adaptable kitchens, level-access showers, and private outdoor terraces. Community hub modules provide lounges, libraries, and fitness spaces.
Studio and 1-bedroom suites with 24-hour care capability. Each suite includes a fully accessible en-suite wet room, kitchenette, and integrated nurse call. Staff base modules with medications room, sluice, and equipment store serve each cluster of 8–12 suites.
Small-scale households of 10–14 residents with domestic-scale kitchen, dining, and living spaces. Continuous loop corridor design eliminates dead ends; colour-coded wayfinding integrated into interior finishes; secure garden modules with raised planters and sensory planting.
Continuing Care Retirement Communities combining independent living, assisted living, memory care, and skilled nursing on a single campus. Modular construction enables phased delivery — open independent living first to generate revenue while care wings complete.
Senior living operators choose modular for single-level, barrier-free residential buildings delivered move-in ready. Our LGS design library includes single-storey villa formats (Harmony House) that adapt directly to senior-living floor plans, with accessible bathrooms and step-free entries engineered in from the start.
| Program | Delivery | Approach |
|---|---|---|
| Independent-living villas | LGS volumetric from standard design library | Single-level layouts, step-free entries |
| Assisted-living residences | Turnkey fit-out, accessible bathrooms | Grab-bar blocking and clearances factory-integrated |
| Campus communities | Phased volumetric delivery | Villas and residence blocks phased across the site |
Discuss your project with our later living specialists. We will prepare a feasibility assessment covering unit mix, care model integration, and phased delivery programme — at no cost.
Get Quote