Hospitals, clinics, diagnostic centres, operating theatres, and senior care facilities — delivered with full HTM and HBN compliance. Our modular healthcare buildings meet the most stringent clinical standards while cutting construction timelines by up to 50%.
Building or expanding healthcare facilities presents unique risks that traditional construction methods struggle to manage.
On-site construction generates dust, debris, and pathogens that threaten immunocompromised patients. Traditional builds require costly containment and negative-pressure zones that extend project duration.
Every day a hospital ward or theatre is under construction is a day of lost patient care and revenue. An operating theatre generates £3,000–£5,000 per day — traditional builds that take 12 months can cost millions in lost clinical income.
Healthcare construction must satisfy overlapping frameworks: HTM, HBN, CQC requirements, Building Regulations Part B (fire), Part M (access), and local NHS trust standards. Non-compliance discovered at handover can delay opening by months.
Clinical needs evolve rapidly. A diagnostic suite today may need to become an ICU tomorrow. Traditional construction locks hospitals into fixed layouts that cost millions to reconfigure — if reconfiguration is possible at all.
Our healthcare modules are engineered to meet the most demanding clinical standards. Key specifications below.
| Requirement | Standard | MODURA Compliance |
|---|---|---|
| HTM Compliance | HTM 08-07 (Modular Buildings), HTM 03-01 (HVAC), HTM 04-01 (Water Safety) | Full compliance with all applicable Health Technical Memoranda for modular healthcare construction |
| HBN Standards | HBN 11-01 (Primary Care Facilities), HBN 04-01 (In-patient Accommodation) | All room sizes, adjacencies, and clinical flow paths designed to Health Building Note requirements |
| Fire Resistance | 120 minutes structural integrity, integrity, and insulation | Steel-frame modules with multi-layer fire-rated board; exceeds NHS Firecode HTM 05-02 requirements |
| Acoustic Separation | DnT,w + Ctr ≥ 50 dB | Independent laboratory-tested wall and floor assemblies; meets HBN 04-01 acoustic criteria for patient privacy |
| Antimicrobial Surfaces | Cu+ equivalent antimicrobial efficacy | Copper-alloy touch surfaces at all hand-contact points; antimicrobial coatings tested to ISO 22196 |
| Medical Gas Systems | HTM 02-01 (Medical Gas Pipeline Systems) | Pre-installed oxygen, nitrous oxide, medical air, and vacuum systems — tested and certified at the factory |
| 24/7 Power Resilience | Type 3 essential electrical services (HTM 06-01) | Dual-redundant switchgear, UPS battery backup, and generator-ready connections pre-integrated per module |
| HVAC with HEPA Filtration | MERV 15 / HEPA H13 filtration, 20 ACH | Positive/negative pressure capability; laminar flow for theatres; 0.3 µm particle removal at 99.97% efficiency |
| Anti-Vibration Isolation | VC-B for diagnostic imaging (ASHRAE) | Isolated module foundations with tuned mass dampers; compatible with MRI and CT suite installation |
| X-Ray Shielding | 2.0 mm Pb equivalence (standard rooms) | Pre-laminated lead shielding integrated into wall panels; verified by radiation protection adviser at factory |
| Infection Control | IPC Class C (HBN 00-09) | Seamless welded vinyl flooring, coved skirtings, flush-surface walls — zero ledges or dust traps; cleanable to clinical standards |
Our healthcare modules are not repurposed commercial units — they are purpose-engineered for clinical environments. Every module is built in our ISO 9001 and ISO 13485 certified factory, with full traceability of materials and processes.
Our modular healthcare buildings are designed and manufactured to the highest UK and international standards.
Modular healthcare building compliance — design, manufacture, installation
Primary and community care facility design standards
Medical devices quality management system for healthcare environments
Firecode — fire safety in the design of healthcare buildings
Water safety — Legionella control in healthcare water systems
From a single operating theatre to an entire hospital wing, our modular system scales to meet any clinical requirement.
Ultra-clean ventilation with laminar flow HEPA H13 filtration; seamless antimicrobial surfaces; integrated medical gas pendants and theatre lights. HTM 03-01 compliant, Type B ultra-clean ventilation as standard.
MRI, CT, and X-ray ready with pre-installed lead shielding, anti-vibration isolation, and cryogen vent paths. Controlled temperature and humidity to diagnostic equipment manufacturer specifications.
Multi-bed and single-room configurations with en-suite bathrooms. Positive/negative pressure isolation capability; nurse call, medical gas, and data at every bedhead. HBN 04-01 compliant room sizes and adjacencies.
Level 3 ICU capability with dual-redundant power, medical air, oxygen, and suction at each bedspace. Dedicated HVAC with 100% fresh air and full exhaust; continuous monitoring infrastructure integrated.
Consultation rooms, treatment rooms, and minor procedure suites with integrated hand-washing stations. Patient flow-optimised layouts per HBN 11-01; telehealth-ready data infrastructure.
Cleanroom-grade environments for aseptic compounding and pathology. Temperature-controlled storage, fume extraction, and GMP-compliant surfaces. Segregated clean and dirty workflows built into the floorplan.
Our healthcare team includes clinical design specialists and HTM compliance engineers. We deliver detailed proposals with full technical schedules within 5 business days.
Get a Free Quote