Standard Design Library

Zurich House

Cube-format two-storey home with dark cladding, stone accents, and an integrated garage.

Ask About Zurich House

Zurich House packs a two-storey program into an efficient cube footprint with an integrated garage - the format for narrow urban lots. Dark cladding and stone accents are factory-applied, and the plan adapts from family home to dual-key configuration.

Gallery

Photos & Details

Zurich House - Street elevation with integrated garage

Street elevation with integrated garage

Zurich House - Rear elevation with cladding detail

Rear elevation with cladding detail

Specification

What Ships With Zurich House

ItemDetail
StructureLGS frame, ICC-ES ESR-5348 evaluated system (IBC/IRC 2021 + CA/LA)
LevelsTwo storeys
Facade optionsRender, timber, stone, dark cladding combinations, factory-applied
DeliveryFlat-pack kit (1-2 x 40ft containers) or volumetric modules
Fit-outShell / standard / turnkey (kitchen, bath, joinery factory-installed)
Code basisIBC/IRC + ASCE 7 (US), AS/NZS 4600 (AU/NZ), Eurocodes (EU)
CustomizationLayout, facade, glazing, finishes configurable
Inclusions & Options

Every Kit Ships Complete

Standard inclusions on every Zurich package. Fit-out level is selectable from structural shell to turnkey.

Engineered LGS Frames

Complete light-gauge steel frames with all connection hardware, roll-formed to ESR-5348 evaluated sections.

Envelope Materials

Exterior cladding, roofing, membranes, and trims, factory-finished in your selected facade mix.

Windows & Doors

Double-glazed windows and exterior doors, sized and pre-fitted to the frame openings.

Full Drawing Set

Construction drawings engineered to your destination code, ready for your local permit holder.

Fit-Out Options

Kitchens, bathrooms, joinery, and flooring can be factory-installed to turnkey level.

Compliance Documents

Mill certificates, warranty, and destination-market compliance package shipped with every kit.

Delivery & Support

From Factory Gate to Your Site

StageWhat MODURA Coordinates
ProductionFactory slot reservation, quality gates, factory acceptance photo report
ShippingContainerized ocean freight, export documentation, marine insurance
ArrivalPort handling and inland transport to site, sequenced to erection order
ErectionErection manual, connection details, and remote support from our engineering team
Also in the Library

Other Standard Designs

Back to the Full Library

Build Zurich House in Your Market

Pricing, plan options, and delivery timelines adapted to your destination code.

Request Zurich House Pricing