Standard Design Library

Bazzurro House

Pool villa with render and stone facade over a light-gauge steel frame, finished to resort grade.

Ask About Bazzurro House

Bazzurro House is the resort-grade format of the library: a render-and-stone pool villa whose wet areas and outdoor rooms are factory-finished. The format suits hospitality operators adding private-pool units and developers building premium villas on constrained sites.

Gallery

Photos & Details

Bazzurro House - Rear elevation with stone base

Rear elevation with stone base

Bazzurro House - Glazed corner living space

Glazed corner living space

Bazzurro House - Steel frame construction stage

Steel frame construction stage

Specification

What Ships With Bazzurro House

ItemDetail
StructureLGS frame, ICC-ES ESR-5348 evaluated system (IBC/IRC 2021 + CA/LA)
LevelsTwo storeys
Facade optionsRender, timber, stone, dark cladding combinations, factory-applied
DeliveryFlat-pack kit (1-2 x 40ft containers) or volumetric modules
Fit-outShell / standard / turnkey (kitchen, bath, joinery factory-installed)
Code basisIBC/IRC + ASCE 7 (US), AS/NZS 4600 (AU/NZ), Eurocodes (EU)
CustomizationLayout, facade, glazing, finishes configurable
Inclusions & Options

Every Kit Ships Complete

Standard inclusions on every Bazzurro package. Fit-out level is selectable from structural shell to turnkey.

Engineered LGS Frames

Complete light-gauge steel frames with all connection hardware, roll-formed to ESR-5348 evaluated sections.

Envelope Materials

Exterior cladding, roofing, membranes, and trims, factory-finished in your selected facade mix.

Windows & Doors

Double-glazed windows and exterior doors, sized and pre-fitted to the frame openings.

Full Drawing Set

Construction drawings engineered to your destination code, ready for your local permit holder.

Fit-Out Options

Kitchens, bathrooms, joinery, and flooring can be factory-installed to turnkey level.

Compliance Documents

Mill certificates, warranty, and destination-market compliance package shipped with every kit.

Delivery & Support

From Factory Gate to Your Site

StageWhat MODURA Coordinates
ProductionFactory slot reservation, quality gates, factory acceptance photo report
ShippingContainerized ocean freight, export documentation, marine insurance
ArrivalPort handling and inland transport to site, sequenced to erection order
ErectionErection manual, connection details, and remote support from our engineering team
Also in the Library

Other Standard Designs

Back to the Full Library

Build Bazzurro House in Your Market

Pricing, plan options, and delivery timelines adapted to your destination code.

Request Bazzurro House Pricing